Explore some of our past projects that demonstrate our commitment to quality and precision. From complex pipework systems to intricate welding projects, our gallery highlights the craftsmanship and attention to detail we bring to every job. These projects showcase the range of industries we serve and the unique problem-solving solutions we provide.
316L Stainless Steel Pipe Welding
Completion Date: August 2025
- Our latest work on 6” SCH 40 316L stainless steel is a perfect example of the strength, durability, and attention to detail that Anglian Pipework is trusted for.
- Every weld is carried out to the highest industry standards, combining technical precision with skilled craftsmanship. This not only guarantees performance and reliability, but also ensures the long-term resilience that our clients depend on in demanding environments.
Boiler Replacement & Pressurisation System Installation
Completion Date: July 2025
- Anglian Pipework Ltd recently completed a comprehensive boiler room upgrade, replacing two existing boilers and installing a new pressurisation unit along with expansion vessels. To ensure uninterrupted operation during the works, a temporary boiler was utilised throughout the project.
- This job was completed within a live plant environment, requiring careful planning and coordination to maintain site operations. The successful delivery highlights our team’s capability in managing complex mechanical upgrades with minimal disruption.
High Pressure & Water Supply Line Installation
Completion Date: July 2025
- Anglian Pipework Ltd recently completed the installation of high-pressure lines servicing jet washers, alongside new water supply lines connected to a modern peeler system. This work was carried out within a complex industrial setting, requiring precise fabrication and expert welding to ensure full compliance with industry standards.
- This project demonstrates our ability to deliver high-quality pipework solutions on both small and large-scale installations. Our team worked efficiently within tight space constraints and in coordination with other onsite operations to minimise disruption and deliver the project on schedule.